Rogers High School, Toledo, Ohio
New construction of a two story brick school with new outdoor track and football field, indoor gymnasium, parking lot and cafeteria. The school was built to serve 2,000+ students- grades 9-12. The ground breaking was on November 10, 2007 and the dedication ceremony was held in July 2009.

Burroughs Elementary School, Toledo, Ohio
New construction of a single story brick school with new indoor gymnasium, parking lot and cafeteria. The school was built to serve 408 students grades K-8.

Robinson Elementary, Toledo, Ohio
A 96,444 sq. ft. two-story new brick construction building, built to serve 684 students in grades 6-8. The building construction consisted of classrooms, offices, meeting spaces, a gymnasium, cafeteria, and an auditorium. The groundbreaking was held on April 24, 2005. The dedication ceremony was held on January 25, 2007. The construction cost was $11.1 million.

E. L. Bowsher High School, Toledo, Ohio
The two-story high school broke ground on November 4, 2005 and the dedication was held on September 10, 2008. The new building consisted of classrooms, offices, conference rooms, restrooms, study spaces, a new gymnasium, boys and girls locker rooms, athletic facility with a weight room, cafeteria, multiple parking lots, and a football stadium with a track. The total square feet of the construction were 232,818. The construction cost was $36.1 million.

Keyser Elementary School, Toledo, Ohio
The single-story brick building was built to serve 368 students in grades K-5. The major components of the construction were a cafeteria, a gymnasium and athletic courts. The groundbreaking was held on March 28, 2006 and the dedication ceremony was held on September 26, 2007. It was a 45,959 sq. ft. building. The construction cost was $7 million.

Oakdale Elementary School, Toledo, Ohio
The two-story school was built to serve 472 students in grades K-5. The major components of the construction were a cafeteria, a gymnasium and athletic courts. The groundbreaking was held on October 28, 2004. The dedication was held on January 18, 2006. It is a 56,970 sq. ft. building. The construction cost was $7.6 million.