Mijan Construction, LLC
Mijan Construction, LLC
  • Home
  • About Us
  • Services
  • Projects
  • Careers
  • Contact Us
  • More
    • Home
    • About Us
    • Services
    • Projects
    • Careers
    • Contact Us
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Services
  • Projects
  • Careers
  • Contact Us

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

K-12 HIGHLIGHTS

Rogers High School, Toledo, Ohio

Rogers High School, Toledo, Ohio

New construction of a two story brick school with new outdoor track and football field, indoor gymnasium, parking lot and cafeteria.  The school was built to serve 2,000+ students- grades 9-12.  The ground breaking was on November 10, 2007 and the dedication ceremony was held in July 2009.

Burroughs Elementary School, Toledo, Ohio

Burroughs Elementary School, Toledo, Ohio

New construction of a single story brick school with new indoor gymnasium, parking lot and cafeteria.  The school was built to serve 408 students grades K-8.

Robinson Elementary, Toledo, Ohio

Robinson Elementary, Toledo, Ohio

A 96,444 sq. ft. two-story new brick construction building, built to serve 684 students in grades 6-8. The building construction consisted of classrooms, offices, meeting spaces, a gymnasium, cafeteria,  and an auditorium. The groundbreaking was held on April 24, 2005. The dedication ceremony was held on January 25, 2007. The construction cost was $11.1 million.

E. L. Bowsher High School, Toledo, Ohio

E. L. Bowsher High School, Toledo, Ohio

  

The two-story high school broke ground on November 4, 2005 and the dedication was held on September 10, 2008. The new building consisted of classrooms, offices, conference rooms, restrooms, study spaces, a new gymnasium, boys and girls locker rooms, athletic facility with a weight room, cafeteria, multiple parking lots, and a football stadium with a track. The total square feet of the construction were 232,818. The construction cost was $36.1 million.

Keyser Elementary School, Toledo, Ohio

Keyser Elementary School, Toledo, Ohio

The single-story brick building was built to serve 368 students in grades K-5. The major components of the construction were a cafeteria, a gymnasium and athletic courts. The groundbreaking was held on March 28, 2006 and the dedication ceremony was held on September 26, 2007. It was a 45,959 sq. ft. building. The construction cost was $7 million.

Oakdale Elementary School, Toledo, Ohio

Oakdale Elementary School, Toledo, Ohio

The two-story school was built to serve 472 students in grades K-5. The major components of the construction were a cafeteria, a gymnasium and athletic courts. The groundbreaking was held on October 28, 2004. The dedication was held on January 18, 2006. It is a 56,970 sq. ft. building. The construction cost was $7.6 million.

Show More

more sectors

higher educationcivil

from concept to completion

let's build together
  • About Us
  • Services
  • Projects
  • Careers
  • Contact Us

CGC1534179

4809 Ehrlich Road, Suite 202, Tampa, FL 33624

(813) 605-5200

Copyright © 2025 Mijan Construction, LLC

All Rights Reserved.